新东方网>重庆新东方学校>大学考试>四六级>正文

2015年6月英语六级备考:阅读理解预测题及答案(2)_英语六级听力技巧

2015-10-16 09:51

来源:新东方网整理

作者:

In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

1. The main difference between panel method and the method discussed in the last paragraph is_______.

A. the latter uses ready-made internal features

B. panels are cast in a level position

C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

D. the former is more expensive than the latter

2. Which of these statements is TRUE of system building?

A. It employs more men. B. It is difficult and dangerous.

C. It can save both time and money. D. It means less mechanization.

3. According to the passage, the principle of system building is that_______.英语六级听力技巧

A. construction methods are safer

B. buildings are made from a set of standardized units

C. similar buildings can be produced

D. all units are produced on the site

4. The usual fixed length in the modular system is_______.

A. twenty centimeters B. ten millimeters

C. fifty centimeters D. ten centimeters

5. What lifts the concrete panels onto the building?

A. Cranes. B. Man-power.

C. Pulleys. D. Hydraulic jacks.

参考答案: 1. A 2. C 3. B 4. D 5. A



新东方重庆学校微信(微信号:xdf_cq)

最新考试资讯、教育新闻,请扫一扫二维码,关注我们的官方微信!

课程推荐

版权及免责声明

凡本网注明"稿件来源:新东方"的所有文字、图片和音视频稿件,版权均属新东方教育科技集团(含本网和新东方网) 所有,任何媒体、网站或个人未经本网协议授权不得转载、链接、转贴或以其他任何方式复制、发表。已经本网协议授权的媒体、网站,在下载使用时必须注明"稿件来源:新东方",违者本网将依法追究法律责任。

本网未注明"稿件来源:新东方"的文/图等稿件均为转载稿,本网转载仅基于传递更多信息之目的,并不意味着赞同转载稿的观点或证实其内容的真实性。如其他媒体、网站或个人从本网下载使用,必须保留本网注明的"稿件来源",并自负版权等法律责任。如擅自篡改为"稿件来源:新东方",本网将依法追究法律责任。

如本网转载稿涉及版权等问题,请作者见稿后在两周内速来电与新东方网联系,电话:010-60908555。

 在线咨询
 课程预约